Thermal power plant
LED lighting
PROJECT: LED lighting of the separated unit of TE-TO Osijek
Existing condition: Mercury lighting, 43.5 kW installed power, 145 pieces, re-illumination above standard, 7 lx average.
New condition: LED lighting, 7.67 kW installed power, 103 pieces, lighting in accordance with HRN EN 12646-2, 14 lx average.
Reduced number of lighting positions thanks to the selection of quality optics.
Control system: Detas WI-FI control system.
Project scope: Lighting of the external plant of TE-TO Osijek and parking lots.
Project end date: 01.02.2014